Sequence 02
Second hospital in the SERP delivery sequence. This page is mapped to its Simpro job section and will hold stakeholder-safe records for attendance, job notes, photo evidence, progress updates, and superintendent review.
Data source: Local SQLite database with Simpro section mapping
Site Records
4
Photo Evidence
0
Simpro Cost Centers
30
Simpro Mapping
Yes
Simpro Routing
This mapping links the SiteVault hospital page to the matching Simpro section. It stores routing metadata only and does not expose commercial values.
Simpro Job
8939
Section ID
10663
Section Name
Weipa
Last Synced
02 June 2026, 03:23 am
Site Documentation Vault
Read-only stakeholder summary of the documentation registers linked to this site. Sensitive visitor contact details, licence files, internal notes, and source-system data remain restricted to GMH admin users.
0
Records linked to this site
Approved SWMS, JSA records, compliance files, revisions, and downloadable stakeholder-safe documents.
1
Records linked to this site
Planned disruption notices, approval evidence, comments, and disruption status tracking.
0
Records linked to this site
High-risk work categories, responsible persons, linked SWMS, attachments, and supporting evidence.
0
Records linked to this site
Working-at-heights applicability, risk descriptions, control measures, permits, photos, and attachments.
0
Records linked to this site
Isolation permit numbers, isolated areas/equipment, approval status, attachments, and close-out records.
0
Records linked to this site
Stakeholder-safe visitor attendance summary without exposing mobile numbers, emails, licences, or uploads.
0
Records linked to this site
Site induction status, document acceptance, sign-off evidence, and induction notes.
0
Records linked to this site
Status changes, approvals, upload history, performed-by metadata, and version-history events.
Stakeholder-safe view of approved and submitted site documents. Internal notes, sensitive files, and source-system data remain restricted to GMH admin users.
Planned disruption notices, approval evidence, timing, comments, and stakeholder-visible status.
Restricted area
Scope of Work Technicians will attend site to undertake detailed circuit identification and switchboard mark-up activities to facilitate future replacement of existing switchboards and/or circuit protection devices. The following switchboards are included: • DB-E1 • DB-N1 • DB-E2 • DB-N2 • DB-N8 • DB-E8 • DB-E6A • DB-U2 • DB-U3 • DB-E7A • DB-U7 • DB-E5 • DB-E5A • DB-U1 • DB-E10 • DB-UPS • DB-N11 • DB-E4 • DB-E4A • DB-E3 • DB-E12 • DB-E13 • DB-E14 • DB-E6 • DB-E7 • DB-E9 • DB-N9 Estimated duration: • Up to 2 hours per switchboard. Works are limited to inspection, circuit tracing, identification, and mark-up of existing electrical infrastructure. Methodology Technicians will establish a safe work area around each switchboard and install appropriate warning signage prior to commencing works. Circuit identification and mark-up will be undertaken using approved LV-rated testing equipment, insulated mats, electrical PPE, and hand tools. No modifications will be made to existing circuits during this attendance. Works are limited to circuit tracing, identification, documentation, and switchboard mark-up to support future upgrade works. No switching, shutdown, isolation, or interruption to electrical supply is anticipated during these activities. Should any unforeseen condition require electrical isolation, works will cease and approval will be sought from Queensland Health representatives before proceeding. Disruption No power interruption is anticipated. Temporary localised access restrictions may occur immediately surrounding switchboards while testing and mark-up activities are undertaken. Security required – N Fire Isolation required – N Isolation of Services required - N
View issued notice documentApproval evidence: Issued via Email on the 11th June 2026
Stakeholder-safe view of high-risk work, working-at-heights controls, and isolation permit records linked to this site.
Stakeholder-safe visitor attendance summary. Mobile numbers, email addresses, licences, uploaded files, and admin notes are not shown here.
Stakeholder-safe summary of induction status, document acceptance, and sign-off evidence.
High-level work packages visible to external stakeholders.
This section will show who attended site, when they attended, and what works they were connected to.
No attendance records yet
Attendance record sync will be added after safe field mapping.
Approved SiteVault photo evidence linked to this site.
No photos uploaded yet
Approved photo evidence will appear here.
These are the core fields that will be captured for each stakeholder-visible record.
The date the works, inspection, attendance, or site activity occurred.
The hospital location connected to the record.
The specific area, room, switchboard, ward, plant room, or work zone.
Names or crew reference for people completing or supervising the works.
The company, subcontractor, or trade group completing the activity.
Clear summary of completed works for the day or activity.
Operational notes suitable for superintendent, consultant, and project manager review.
Linked progress, completion, or issue photos supporting the record.
Draft, submitted, under review, published, or closed.
This table only shows published stakeholder-visible records.
| Date | Location | Workers | Company / Trade | Work Completed | Photos | Status |
|---|---|---|---|---|---|---|
| 12 Mar 2026 | Weipa hospital | Adrian | GMH Solutions | Started Admin works. Record Details Location of work: Weipa hospital Date: 13/03/2026 Person working: Adrian Lunch taken: Yes Time worked: 7.00am - 3.00pm Follow Up: continue works Photos: NA | 0 | Published |
| 11 Mar 2026 | Weipa hospital | Adrian | GMH Solutions | Finished walk through of weipa hospital. Record Details Location of work: Weipa hospital Date: 12/03/2026 Person working: Adrian Lunch taken: Yes Time worked: 6.30am - 4.00pm Follow Up: continue works Photos: NA | 0 | Published |
| 09 Mar 2026 | Weipa | Adrian | GMH Solutions | Finished walk through of weipa hospital. Record Details Location of work: Weipa Date: 11/03/2026 Person working: Adrian Lunch taken: Yes Time worked: 6.30am - 2.30pm Follow Up: continue works Photos: NA | 0 | Published |