SWMS / JSA / Compliance Docs
Approved / Complete1
Records linked to this site
Approved SWMS, JSA records, compliance files, revisions, and downloadable stakeholder-safe documents.
Sequence 03
Third hospital in the SERP delivery sequence. This page is mapped to its Simpro job section and will hold stakeholder-safe records for attendance, job notes, photo evidence, progress updates, and superintendent review.
Data source: Local SQLite database with Simpro section mapping
Site Records
21
Photo Evidence
25
Simpro Cost Centers
22
Simpro Mapping
Yes
Simpro Routing
This mapping links the SiteVault hospital page to the matching Simpro section. It stores routing metadata only and does not expose commercial values.
Simpro Job
9036
Section ID
10662
Section Name
Napranum
Last Synced
02 June 2026, 03:23 am
Site Documentation Vault
Read-only stakeholder summary of the documentation registers linked to this site. Sensitive visitor contact details, licence files, internal notes, and source-system data remain restricted to GMH admin users.
1
Records linked to this site
Approved SWMS, JSA records, compliance files, revisions, and downloadable stakeholder-safe documents.
0
Records linked to this site
Planned disruption notices, approval evidence, comments, and disruption status tracking.
0
Records linked to this site
High-risk work categories, responsible persons, linked SWMS, attachments, and supporting evidence.
0
Records linked to this site
Working-at-heights applicability, risk descriptions, control measures, permits, photos, and attachments.
0
Records linked to this site
Isolation permit numbers, isolated areas/equipment, approval status, attachments, and close-out records.
0
Records linked to this site
Stakeholder-safe visitor attendance summary without exposing mobile numbers, emails, licences, or uploads.
0
Records linked to this site
Site induction status, document acceptance, sign-off evidence, and induction notes.
0
Records linked to this site
Status changes, approvals, upload history, performed-by metadata, and version-history events.
Stakeholder-safe view of approved and submitted site documents. Internal notes, sensitive files, and source-system data remain restricted to GMH admin users.
SWMS
Electrical Works to be completed under QC128971
Planned disruption notices, approval evidence, timing, comments, and stakeholder-visible status.
Stakeholder-safe view of high-risk work, working-at-heights controls, and isolation permit records linked to this site.
Stakeholder-safe visitor attendance summary. Mobile numbers, email addresses, licences, uploaded files, and admin notes are not shown here.
Stakeholder-safe summary of induction status, document acceptance, and sign-off evidence.
High-level work packages visible to external stakeholders.
This section will show who attended site, when they attended, and what works they were connected to.
No attendance records yet
Attendance record sync will be added after safe field mapping.
Approved SiteVault photo evidence linked to this site.
These are the core fields that will be captured for each stakeholder-visible record.
The date the works, inspection, attendance, or site activity occurred.
The hospital location connected to the record.
The specific area, room, switchboard, ward, plant room, or work zone.
Names or crew reference for people completing or supervising the works.
The company, subcontractor, or trade group completing the activity.
Clear summary of completed works for the day or activity.
Operational notes suitable for superintendent, consultant, and project manager review.
Linked progress, completion, or issue photos supporting the record.
Draft, submitted, under review, published, or closed.
This table only shows published stakeholder-visible records.
| Date | Location | Workers | Company / Trade | Work Completed | Photos | Status |
|---|---|---|---|---|---|---|
| 26 Aug 2026 | Napranum hospital | Staff listed in Simpro timeline | GMH Solutions | 0630 Arrive at site. Sign in. Complete JSA. Check actual layout of rooms against plans and make notes. 1000 Smoko. 1015 Continue making notes. Attempted to pre-wire dental Clinic. Discovered walls to contain noggins and lack of 2.5mm2 cable. Unable to continue. 1300 Lunch. 1330 Install cabling (remaining SWA and some existing circuits. Discussed cutting trip short with Greg. Confirmed. Pack up/clean up. Stored remaining materials in site shed. Sign out. Complete job notes. 1630 Finish. Materials: NA Record Details Location of work: Napranum Date: 27/08/26 Persons working: Toppy, Sam, Ryan Lunch taken: 30mins @ 1300 Time worked: 0630 - 1630 Follow Up: NA | 0 | Published |
| 25 Aug 2026 | Napranum hospital | Staff listed in Simpro timeline | GMH Solutions | 0630 Arrive at site. Sign in. Conplete JSA. Install cabling (P16,17,18). 0950 Smoko. 1005 Install cabling 1045 Meeting with Adrian to discuss future works. 1115 Tie-in run cables to ensure neatness. 1300 Lunch. 1330 Install cabling (P19,20, 21, P1). Tie-in run cables. 1600 Pack up/clean up. Sign out. Complete job notes. 1630 Finish. Materials: NA Record Details Location of work: Napranum Date: 26/08/26 Persons working: Toppy Lunch taken: 30mins @ 1300 Time worked: 0630 - 1630 Follow Up: NA | 0 | Published |
| 24 Aug 2026 | Napranum hospital | Staff listed in Simpro timeline | GMH Solutions | 0700 Arrive at site. Sign in. Complete JSA. Prepare to run cabling. Make penetration in wall for circuits to get to new MSB location. Remove existing 450mm tray and install 600mm tray. 1215 Smoko/lunch. 1300 Install P11, P12, P13, P15. Tie circuits into catenaries and tray. 1545 Fault-find vehicle. 1700 Finish. Materials: - 1m x 25mm corri (ute stock) - 1m x 32mm corri (ute stock) Record Details Location of work: Napranum Date: 25/08/26 Persons working: Toppy Lunch taken: 30mins @ 1230 Time worked: 0700 - 1700 Follow Up: NA | 0 | Published |
| 24 Aug 2026 | Napranum hospital | Staff listed in Simpro timeline | GMH Solutions | sign in - Complete pre start with the Labour Hire EDC: - Installed 8 subcircuits. Adrian: - SERP - Set meeting with Ideal and Powerhouse. - Napranum - Material procurement. - Napranum - Send kris correspondence regarding civil works. Materials: - 1.5mm2 2C+E TPS x 270m - 2.5mm2 4C + E OC x 50m - 2.5mm2 2C + E TPS x 270m - Cable ties Record Details Location of work: Napranum PHC Date: 24/08/26 Persons working: Adrian, Sam (EDC), Ryan (EDC) Lunch taken: 30 mins Time worked: 0630 - 1630(Ryan/Sam), 0630 - 1630 (Adrian), Follow Up: continue works | 0 | Published |
| 23 Aug 2026 | Napranum hospital | Staff listed in Simpro timeline | GMH Solutions | sign in - Complete pre start with the Labour Hire EDC: - Installed the 120mm2 XLPEs and cable tied them in on the complete length of tray. Adrian: - Aurukun - Laised with about Generator Trailer and Materials required for the replacing the existing body protect circuits. - Aurukun - Laise with NSE about lead time for the CT enclosure. - SERP - Liase with NIK to get Materials released. - Napranum - Walk Toppy through the Napranum and the status of the project. - Aurukun - Liased with George about Body protect areas. - Aurukun - Send quotation request for generator wheel. - Aurukun - Send Quotation request for transportation of wheels to aurukun. Materials: - 200m x 120mm2 XLPE - Cable ties. Record Details Location of work: Napranum PHC Date: 24/08/26 Persons working: Adrian, Sam (EDC), Ryan (EDC) Lunch taken: 30 mins Time worked: 0630 - 1630(Ryan), 0630 - 1630 (Adrian), 0730 - 1630 (Sam) Follow Up: continue works | 0 | Published |
| 23 Aug 2026 | Napranum hospital | Staff listed in Simpro timeline | GMH Solutions | sign in - Complete pre start with the Labour Hire EDC: - Installed all of catenary wire required throughout the facility. 14 cat wires in total. Adrian: - Supervised Labour hire. - Aurukun - Send Daniel (Bonlec) Info of BMS. - Hopevale - Send 3 quotation requests for Shed. Materials: - Catenary wire x 160m - Gripples x 28 Record Details Location of work: Napranum PHC Date: 21/08/26 Persons working: Adrian, Harley (EDC), Ryan (EDC) Lunch taken: 30 mins Time worked: 0630 - 1500(Harley/Ryan), 0630 - 1600 (Adrian) Follow Up: continue works | 0 | Published |
| 20 Aug 2026 | Napranum hospital | Staff listed in Simpro timeline | GMH Solutions | sign in - Complete pre start with the Labour Hire EDC: - Installed all of catenary wire required throughout the facility. 14 cat wires in total. Adrian: - Supervised Labour hire. - Aurukun - Send Daniel (Bonlec) Info of BMS. - Hopevale - Send 3 quotation requests for Shed. Materials: - Catenary wire x 160m - Gripples x 28 Record Details Location of work: Napranum PHC Date: 21/08/26 Persons working: Adrian, Harley (EDC), Ryan (EDC) Lunch taken: 30 mins Time worked: 0630 - 1500(Harley/Ryan), 0630 - 1600 (Adrian) Follow Up: continue works | 0 | Published |
| 19 Aug 2026 | Napranum hospital | Staff listed in Simpro timeline | GMH Solutions | sign in - Complete pre start with the Labour Hire EDC: - Installed the last of the cable tray between the office area and the staff room. - Double checked the installation of the entire route of the cable tray and fixed remaining parts. Inside cable tray is complete. - Installed Cable tray above the New MSB. - Continued installing catenary wires between treatment room and admin area. - Revised plan with Adrian for catenary wire routes throughout the building. Adrian: - Supervised Labour hire. - Inspected Dawsons accommodation. - SERP: Fortnightly meeting. - SERP: GMH meeting. - Aurukun: Respond to engaged services regarding Switchboard enclosure. - SERP: Continued designing the fuel tank for the truck. - Prepared and sent Hopevale disruption notice to Kris. Materials: - 750mm Counter leavers x 2 - 40mm x 40mm Uni Strut x 1.5m - 450mm Cable tray x 2 lengths - Splice Plates x 4 - Consumables - Tray nuts and bolts, Normal Bolts, Nuts, Washes, Spring washes. - Catenary wire x 20m - Gripples x 4 Record Details Location of work: Napranum PHC Date: 20/08/26 Persons working: Adrian, Harley (EDC), Ryan (EDC) Lunch taken: 30 mins Time worked: 0730 - 1630 (Harley/Ryan), 0730 - 1330, 1400 - 1630 Follow Up: continue works | 0 | Published |
| 19 Aug 2026 | Napranum hospital | Staff listed in Simpro timeline | GMH Solutions | sign in - Complete pre start with the Labour Hire EDC: - Installed the last of the cable tray between the office area and the staff room. - Double checked the installation of the entire route of the cable tray and fixed remaining parts. Inside cable tray is complete. - Installed Cable tray above the New MSB. - Continued installing catenary wires between treatment room and admin area. Adrian: - SERP: Laise with Engaged Services for lead times and final measurements and approvals of all enclosures and cages - Aurukun: Laise with Linden for measurements of enclosures. - Napranum: Finalise Variation 1. Materials: - 750mm Counter leavers x 2 - 40mm x 40mm Uni Strut x 3 - 450mm Cable tray x 10 lengths - Splice Plates x 10 - Consumables - Tray nuts and bolts, Normal Bolts, Nuts, Washes, Spring washes. - Radius Plate: 500mm Record Details Location of work: Napranum PHC Date: 20/08/26 Persons working: Adrian, Harley (EDC), Ryan (EDC) Lunch taken: 30 mins Time worked: 0730 - 1630 Follow Up: continue works | 0 | Published |
| 18 Aug 2026 | Napranum hospital | Staff listed in Simpro timeline | GMH Solutions | sign in - Complete pre start with the Labour Hire - Supervised Labour Hire. - The labour Hire staff completed the installation of approximately 85% of the cable tray from the existing main switchboard towards the location of the new main switchboard. Adrian: - SERP: Laise with Engaged Services for lead times and final measurements and approvals of all enclosures and cages - Aurukun: Laise with Linden for measurements of enclosures. - Napranum: Finalise Variation 1. Materials: - 750mm Counter leavers x 2 - 40mm x 40mm Uni Strut x 3 - 450mm Cable tray x 10 lengths - Splice Plates x 10 - Consumables - Tray nuts and bolts, Normal Bolts, Nuts, Washes, Spring washes. - Radius Plate: 500mm Record Details Location of work: Napranum PHC Date: 19/08/26 Persons working: Adrian, Harley (EDC), Ryan (EDC) Lunch taken: 30 mins Time worked: 0730 - 1630 Follow Up: continue works | 0 | Published |
| 17 Aug 2026 | Napranum hospital | Staff listed in Simpro timeline | GMH Solutions | sign in - scope site - Complete pre start with the Labour Hire - Took truck to tyre power weipa - Supervised Labour Hire. - The labour Hire staff completed the installation of all of the counter leaver bracket, all of the Unistrut bare 4 x lengths (Due to access of rooms) and 3 x cat wire installations. - Pick up truck from tyre power - Aurukun: Responded to Kris about approximate times for the cutovers for the Shutdowns on the weekend so that the ICT staff are aware. - SERP: Send lead time request to engaged services for cages and enclosures. Materials: - 750mm Counter leavers x 8 - 40mm x 40mm Uni Strut x 4.5m - Gripple Wire x 24m - Gripples x 6 Record Details Location of work: Napranum PHC Date: 18/08/26 Persons working: Adrian, Harley (EDC), Ryan (EDC) Lunch taken: 30 mins Time worked: 0715 - 1630 Follow Up: continue works | 0 | Published |
| 17 June 2026 | Napranum hospital | Staff listed in Simpro timeline | GMH Solutions | Distribution Board Labelling & Cable Tray Site Assessment Record Details Arrived on site, signed in, and completed the required Job Safety Analysis (JSA). Completed the remaining labelling of DBN1. Labelled DBE1, followed by DBN2 and DBE2. Completed all scheduled distribution board labelling at the Aurukun site. Packed up tools and equipment upon completion of the labelling works. Coordinated the upcoming Napranum and Aurukun projects with BEMS, who issued the required notifications to the relevant site contacts. Travelled to Napranum, arriving at 11:47. Signed in, familiarised the team with the site, and completed a Job Safety Analysis (JSA). Labelled DB1 and DB2. Inspected the ceiling space and investigated the proposed cable tray route and preferred method of attachment for future installation works. Signed out and returned to Weipa after completing the site inspection. | 0 | Published |
| 12 Mar 2026 | Napranum hospital | Greg | GMH Solutions | Napranum Hospital and Weipa Hospital - site walk | 0 | Published |
GMH Internal Tools
Site-specific internal review, upload, approval, and audit tools. These links are for GMH users and require internal login.
Timeline Needs Review
Route ambiguous Simpro timeline entries to the correct hospital site.
Timeline Draft Review
Edit, hold, or publish stakeholder-visible timeline records.
Photo Review
Approve Simpro photo metadata and manage stakeholder photo evidence.
Photo Workflow
Internal checklist for safely publishing stakeholder photo evidence.
Compliance Documents
Add SWMS, JSA, and compliance documents to the SiteVault.
Disruption Notices
Create planned disruption notices for stakeholder display.
High Risk Work
Link high-risk work records to approved SWMS and JSA PDFs.
Isolation Permits
Record electrical, fire, and service isolation approvals.
Site Inductions
Record inductions, document acceptance, and sign-off evidence.
Visitor Review
Review visitor and subcontractor sign-ins before stakeholder release.
Visitors On Site
View live signed-in visitor and subcontractor records.
Audit Log
Review SiteVault submissions, approvals, sign-ins, and sign-outs.
Compliance Matrix
Review missing, pending, complete, and not applicable registers.